Sea Tech

 

 

RUS

rus

ENG

eng

 
| NEWS | ABOUT SEA TECH | SERVICES | REFERENCE LIST | PARTNERS | CONTACTS |

Ñóäîñòðîèòåëüíàÿ êîìïàíèÿ Ñè Òåõ

 

 
 
 

Buoy Tender

Project  02781

Full design cycle

 
Buoy-laying vessel

design

deñk plans

characteristics

specification

model

photo from yard

photo of details

final photo

 
 

Arrangement & Layout

The hull is divided into 4 watertight compartments:

- Forepeak: Includes a chain locker and store, with a ballast tank located below.

- Accommodation Spaces: Features a special personnel cabin, messroom, food heating station (galley area), captain’s and engineer’s cabins, drying room, and sanitary unit. A dry compartment is located beneath the platform.

- Engine Room: Houses the main propulsion plant, auxiliary machinery, sea chests (ice boxes), as well as fuel and sewage tanks.

- Afterpeak: Contains the steering gear compartment and a chain locker.

Deckhouse:

The wheelhouse is positioned on the forecastle deck. The upper deck features funnel casings, ventilation ducts, and a companionway providing internal access to the accommodation hold, engine room, and wheelhouse.

Working Deck:

The upper deck and the stern crinoline (at deck level) are designed for the storage, transportation, and maintenance of sea buoys. For these operations, the vessel is equipped with a specialized winch and a cargo crane.
 

Copyright © SeaTech All Rights Reserved®