Class Design: MEB-SPb
(St. Petersburg)
Detailed
Design: Sea Tech Ltd., 2015-16
Customer:
MRS of Rosmorrechflot (Moscow)
Yard - Oka
Shipyard (Navashino, Rus)
The Project TG17 is a multipurpose ice-strengthened tug equipped
with twin azimuth thrusters (Z-drives). The vessel features an
extended forecastle, a two-tier wheelhouse with 360-degree
visibility, and an aft working deck.
- Towing winch and aft roller (D=900 mm).
- Cargo knuckle-boom crane and main deck container fittings.
- 5m RIB workboat and bow pushing knees.
- Firefighting system: Two monitors on the forecastle deck and a
main engine-driven fire pump.
- Offshore towing of vessels and floating structures.
- Auxiliary harbor operations.
- Oil Spill Response (OSR) support, including boom deployment
and equipment transport.
- Firefighting for floating and shore-based facilities.- General deck cargo transportation.
The lead ship, Penay, was launched in September 2016. The
vessel's delivery to deep water was executed using a specialized
pontoon (Project 20360p) based on a delivery project developed
by Sea Tech.
Photo 2: Cadmatic 3D working model.
Photos 3–5: Courtesy of www.meb.com.ua.
Photo 4: G.V. Egorov (CEO of MEB) and P.V. Ezhov
(CEO of Sea Tech).
Photo 9: V.Y. Krynochkin, Chief Designer of the Detailed
Design (Sea Tech).
Photo 10: P.V. Ezhov and N.I. Markov (Oka Shipyard).
Photo
14-15: Vessel delivery to deep water via a specialized pontoon
system.
|
Length
overall |
31.7 m |
|
Breadth overall |
9.70 m |
|
Hull length |
30.9 m |
|
Breadth |
9.10 m |
|
Depth at midships |
4.10 m |
|
Air draft (fixed parts) |
11.1 m |
|
Draft |
3.10 m |
|
Displacement |
560 t |
|
ME power |
2х597 kW |
|
Speed |
10 kn |
|
Endurance |
10 days |
|
Crew / berth |
7 / 12 |
|
Fire monitor capacity |
2x300 m³/h |
|
Winch Pull |
20 t |
|
Class RS
КМ
Arc4 R1 AUT3-C FF3WS Tug |
|
|
|