|
Classification Design - MEB (Odessa,
Ukraine)
Detailed
Design - Sea Tech Ltd.
Customer -
FSI "Rechvodput" (Moscow, Russia)
Yard -
Sosnovka Shipyard (Russia), 2015
The Project
RT29 environmental vessel is designed to receive solid waste, sewage, and oily bilge water,
and subsequently transfer them to shore-based reception facilities.
The lead vessel "Ekolog-1" and the second vessel "Onezhets
BBK" were launched in May 2015.
|
Length
overall |
43.0 m |
|
Breadth overall |
7.9 m |
|
Length |
42.0 m |
|
Breadth |
7.5 m |
|
Depth at midships |
2.1 m |
|
Height overall (fixed parts) |
12.0 m |
|
Draught |
1.65 m |
|
Deadweight |
207 t |
|
Capacity of
sewage holding /oily bilge water tanks |
128 / 54 t |
|
Deadweight |
207 t |
|
ME power |
2 х 208 kW |
|
Speed |
10 kn |
|
Endurance |
7 days |
|
Crew |
6 pers |
|
Class RRR |
+O 2.0 (Ice 20)
A |
|
|
|